Converse, refine, compare and recover PurpAI drafts
Understand Ask, Review and Revise; safely accept or reject proposals; compare changes, restore accepted versions and resume work after leaving the Studio.
Two important concepts: accepted draft and pending proposal
PurpAI holds a latest accepted working version separately from a pending proposal. Revisions use the latest accepted draft as their starting point. If you refine a still-pending proposal, the refinement uses that pending version as context. Neither Ask nor Review changes the document.
Every substantive change should be reviewed before acceptance. If another browser tab updates a draft, Studio can reject an outdated action rather than silently overwriting the newer accepted text.
1. Use the conversation menu correctly
After creating or reopening a draft, locate Conversation action below the transcript and choose one of these three intents.
| Action | Sample instruction | Expected outcome |
|---|---|---|
| Ask | “What is the difference between an exception and an escalation in this SOP?” | PurpAI answers in the conversation, without editing the draft. |
| Review | “Are responsibilities and exception handling clear?” | PurpAI comments on possible gaps without generating a replacement document. |
| Revise | “Clarify escalation responsibilities in the escalation section.” | PurpAI prepares a proposal you can compare and accept or reject. |
You can use a blank message for the Review action if you want a general review, while Ask and Revise require a meaningful message. The transcript identifies the user and PurpAI messages; the expandable Document proposal history records draft and revision events.
2. Make a targeted revision
Accept a useful base version
If you have just generated your first draft, choose Accept proposal before asking for a separate revision. This establishes the working version from which later changes are compared.
Choose Revise and a scope
Select Revise — propose document changes. Under the message field, choose Entire document or a specific section shown in the scope dropdown. Scope is useful for instructions such as “Improve the exception process without changing the technical steps.”
Write an explicit instruction
Say what to change and what must stay unchanged. For example: “In Escalation Path, explain who raises an unresolved incident and who approves an exception. Preserve the other sections.” Avoid asking the model to invent organisation-specific names, SLAs or compliance status.
Inspect the proposed result
Select Propose change or Refine proposal if a proposal is already pending. The preview then shows the differences or both versions, depending on the comparison mode. Carefully inspect sections that were not supposed to change.
Accept, refine or reject
Accept proposal makes the proposal the newest accepted working version. Reject proposal leaves the previous accepted text intact. If the idea is useful but incomplete, continue refining the pending proposal before accepting it.
3. Compare versions without losing context
When Studio has both an accepted document and a pending proposal, use the comparison controls above the preview. Changes by section highlights added and removed text under headings; Full documents shows both documents. The comparison is performed locally, not by making another AI request.
- Use Changes by section to locate unexpected additions or deletions quickly.
- Expand sections to inspect the before-and-after text.
- Switch to Full documents when visual structure, ordered steps or cross-section context matters.
- For long sections, the comparison may show before/after blocks rather than an expensive word-by-word diff.
- Do not interpret highlighted edits as proof that the new wording is correct.
4. Restore an earlier accepted version
- Ensure there is no unresolved pending proposal. Resolve it first if necessary.
- Open Restore a previously accepted version in the conversation history area.
- Choose a historical accepted version from the dropdown.
- Use Compare with current to inspect the selected old text against your current accepted version.
- Choose Propose restore. This creates a new pending restoration proposal; it does not erase the latest accepted document.
- Review the restoration proposal and choose Accept proposal to make the restored text the new accepted version.
The ability to restore a past version depends on it still being retained under the organisation’s revision and draft-retention rules. Older history can be pruned; Studio is not an indefinite archival repository.
5. Find an unfinished draft on another device
Return to the right document type
Open Policy Manager and choose the document type associated with the previous draft. For example, an SOP draft should be opened from the SOP creation workflow, not a Policy form.
Open My drafts
In the Studio header, select My drafts. This list is loaded from your organisation’s tenant database, not from an identifier saved in a particular browser tab.
Search or browse
Use the document-type filter and title search to locate your work. The list identifies the type, working status and most recent update. You may display all types for reference, but drafts of another type cannot be opened into the wrong editor.
Open and continue
Choose Open. The conversation, latest accepted working draft, pending proposal (if any), revision history and most recent quality review are restored as available. You must be signed in as the user who owns the draft and remain within the relevant organisation.
Resume last draft is a shorter option when the same browser tab still remembers a valid draft. Use My drafts for reliable cross-session and cross-device discovery.
6. Know when history expires
PurpAI sessions and revisions are temporary authoring data. The organisation administrator can configure unfinished-draft inactivity (default 30 days) and full revision limits (default 20). A scheduled cleanup process removes expired temporary content. Exact retention settings may differ for your organisation.
A post-save retention setting (default 14 days) exists for drafts whose successful Policy Manager save has actually been confirmed to Studio. Using a draft in the editor is not a confirmed save, and the verified save-completion integration is not yet part of the documented Studio handoff. Do not rely on the 14-day rule applying immediately after an editor transfer.
Final governed policies in Policy Manager follow a different lifecycle and must not be confused with temporary Studio drafts. Do not assume that deleting a Studio session immediately deletes a provider-held request or an existing backup copy.
Practice exercise: controlled improvement
- Generate a generic SOP for routine operational checks and accept its first proposal.
- Choose Review and ask whether ownership and escalation are clear. Note the recommendations; no document change should occur.
- Choose Ask and request clarification about the strongest recommendation. Again, no edit should occur.
- Choose Revise and ask to implement one specific, safe improvement from the review.
- Compare the sections, reject a deliberately unsuitable proposal or accept a good one.
- Close Studio, reopen the same document type, select My drafts and confirm you can recover the accepted version and conversation.
If the accepted text changes merely from Ask or Review, or an older browser tab overwrites newer work, stop testing and report the problem.
Troubleshooting
A proposed change affected unrelated sections
Compare by section before accepting. Reject and retry with a narrower scope and clearer instructions. The instruction is a request, not a guarantee the model will edit only that section.
The previous version is missing from Restore
Only retained accepted revisions appear in the restoration options. Check the draft age and ask the administrator about configured revision limits.
My draft does not appear in My drafts
Check the signed-in account, organisation, type filter, title search and retention expiry. Also confirm the document was created in the Studio rather than saved directly as a Policy Manager record.
Studio reports that a version changed
Another tab or device may have updated the session. Reopen the draft from My drafts and compare the latest accepted version before sending further changes.